FAQs
More FAQs- How do I maintain this floor after the urethane application?
- Will the application of urethane disrupt my business?
- How long will it take to have my floors coated with acrylic?
Leave the daily cleaning to the professionals at ServiceMaster of Swift Current. We offer daily, weekly or monthly cleaning services for your facility. Urethane finish requires only damp mopping on a daily basis or the use of an auto scrubber with a white or red pad or a soft brush. Mop with a properly diluted neutral cleansing agent and warm water. Overuse of cleaning chemicals can build up and leave a residual film on the floor. Never buff your floor; a loss of gloss may occur.
The initial application process will require stripping any existing coatings and applying urethane coating plus drying time. This process can be done after hours and will require only daily cleaning for the life of the finish, averaging two years. Because there is no buffing or recoating for that time period, there will be no other disruptions. The reapplication process will not require further stripping.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.