FAQs
More FAQs- Do I need to do anything prior to the technician arriving for my scheduled service?
- Do all staff receive training and development?
- How long will it take to have my floors coated with acrylic?
Yes. Remove breakables from the tops of furniture in the room we will be cleaning. Pick up moveable items from the floor in areas you want cleaned, such as rugs, plants, trash cans, chair mats, etc. Pre-vacuum all areas to be cleaned, unless pre-vacuuming is part of your service agreement.
All managers and supervisors receive ongoing and comprehensive training on the management of the sites they are allocated. All cleaning staff receive in-house and on-site training on process, products and equipment needed to carry out their given duties. All Health and Safety issues and company policies are covered in their initial induction with annual refresher training, as needed.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.